Three pages on what is actually wrong. Then thirty engagements that answer it, built around one idea: the City cannot hire its way out of an obligation this size, and technology is the only lever large enough to close the gap. Scope and duration only. No fees.
Three pages on the problem. Then 32 engagements that answer it. Nothing in between.
Each one alone is manageable. Together they are the reason this document exists.
The Consent Order is not the problem. It is the symptom. A department that could produce its own record on demand would never have received an assessment in April 2026, because the reports would have gone out on time and the counts would have agreed with each other.
The same gap explains the revenue position. A City that cannot say how many inlets it owns cannot say how much water it loses, and a City that cannot say how much water it loses cannot defend a rate. The regulator and the ratepayer are asking the same question in different words.
Three gaps are worth naming now, because each becomes an engagement later.
It is a decision to pay more later, from a weaker position, with fewer options.
The City cannot raise bonds from where it stands today, and that is the constraint that matters most, because bonds are the only instrument large enough for what the system needs.
An underwriter and a rating agency look at three things first. Is there an open enforcement action. Is there a tested rate that covers cost. Is there a record that supports the numbers in the offering. The City currently answers no, no and no. None of those three is expensive to fix. All three take time, and time is the one input that cannot be bought later.
This is the sequence that matters. Grants and revolving fund loans are reachable now and should be pursued now. Bonds become reachable in year three, but only if the work that makes them reachable starts in year one.
That is a far better problem than not having a funding source at all.
Every gate in that figure is closed by a document, a count or a decision. None is closed by construction. That is why the first year of this program is inexpensive relative to what it unlocks, and why sequencing matters more than budget.
The disadvantaged community position is the asset here. It is what moves a share of the program from repayable loan to forgivable, and it has to be documented rather than asserted.
The gap between what the City is obliged to do and what it can staff is too large for hiring to close.
A department carrying 1,092 scheduled compliance actions in 180 days does not have a motivation problem. It has an arithmetic problem.
Adding staff is the obvious answer and it is the wrong one, for three reasons. The positions are not funded. Recruitment for regulated utility roles in this market is slow and competitive. And headcount added to an unstructured process produces more unstructured output, not more proof.
| The task | Time it takes today | Time it takes when instrumented |
|---|---|---|
| Recording an inspection | Paper form, then re-keyed, then filed, sometimes lost | Entered once on a phone, at the asset, with a photograph and a timestamp |
| Reading a pump station | A truck roll, a clipboard and a delay | Reported continuously. The truck goes where the exception is |
| Producing a period report | Several days of assembly from four systems | Generated from the record. Reviewed and signed |
| Answering an asset count | Three documents, three different answers | One number, sourced and dated |
| Knowing something is late | When the regulator writes | Before it is late, to the person who owns it |
None of the right hand column requires new staff. All of it requires the record to exist in one place, which is what Section 2 is about.
The City's system of record for regulatory compliance.
Civic is one idea. Every obligation the City carries, every piece of evidence that satisfies it, and every report produced from it, held in one place that belongs to the City.
Today that record does not exist as a single thing. It exists as a folder on a shared drive, a spreadsheet on a desktop, paper forms in a truck, an inbox, and the memory of one person. Each is a real record. None is the record. When the Department asks a question, somebody reassembles the answer from all five, and that reassembly is the risk.
Because the City should not be buying software. Software is something a vendor owns and rents back. What the City needs is its own record, in a structure that matches its own obligations, that it can take to any vendor, consultant or regulator without asking permission.
Civic is that structure. It is configured, populated and handed over. If APAS disappeared, the City would still hold the register, the evidence, the history and the reports.
The important line is the middle one. There is no separate reporting exercise. A bi-monthly report is a view of the record filtered to a date range. If the field work happened and the evidence was captured, the report already exists.
Stations is a module rather than a separate system deliberately. A pump station information system that does not share a record with the compliance register simply creates a sixth place to look.
| The question | Today | With Civic |
|---|---|---|
| What is due this month? | Reconstructed from the order, the permit and eleven procedures, by one person | A screen. Filtered by owner, sorted by date |
| Did we do it? | Search a drive, a truck and an inbox. Sometimes it cannot be established | Evidence attached to the obligation, with date and author |
| Can we prove it to FDEP? | Assemble a submittal by hand over days, and hope nothing was missed | Generate the period report. Review, sign, send |
| How many assets does this apply to? | Four documents give three different answers | One number, sourced, dated, used everywhere |
The fourth row also unlocks the funding conversation. Every application asks for asset counts, and every reviewer notices when they move between documents.
A utility that is sustainable, resilient and financially self carrying.
The purpose of this program is not compliance. Compliance is year one. The purpose is a utility that funds its own renewal from its own revenue, absorbs a shock without a crisis, and plans for the residents it will serve in twenty years rather than the ones it is apologizing to this month.
Some of this pays for itself. Some prevents a loss. The rest makes both possible.
32 engagements, grouped by what they achieve rather than who delivers them.
The tracks are not sequential. Track A begins immediately because the obligations are live. Track B begins early because the revenue answer takes longest to arrive. Track C follows the funding calendar rather than the City's. Track D depends on outputs from A and B.
Compliance, evidence, and the system that holds it.
Everything here exists to make the City provable. Not to make it do more work, but to make the work it already does visible to a regulator, a lender and a Commission.
One place where every regulatory obligation, its owner, its frequency and its evidence live together, so a report is produced from the record rather than assembled from memory.
| Produces | Obligation register, field capture, evidence store, report generation, and a live view of what is due, what is late and who holds it. |
| Duration | Phase 1 in 90 days. Full program over 12 months. |
| Driven by | Consent Order 6(e) and 7. MS4 Permit Part III reporting. |
| Funding route | SRF planning. Operating budget. |
| Return | AVOIDED COST |
Bring every lift and pump station into one record: run hours, alarms, overflow events, inspections, maintenance and the reporting each one triggers.
| Produces | Station inventory with condition, digital inspection forms, overflow and alarm log, notification workflow, and the station chapter of every regulatory report. |
| Duration | Six months, following Civic Phase 1. |
| Driven by | Sanitary sewer overflow reporting. FDEP wastewater obligations. |
| Funding route | SRF. Operating budget. |
| Return | AVOIDED COST |
Stop accepting infrastructure the City cannot maintain. One written standard every developer and contractor must meet before an asset is conveyed, and the gate that enforces it.
| Produces | Design standards manual for water, sewer and stormwater. Standard details. Submittal and review checklist. Conveyance and acceptance procedure. As built and GIS data at handover. |
| Duration | Six to nine months. |
| Driven by | Consent Order 6(b). Lifetime cost of every asset the City inherits. |
| Funding route | Operating budget. Recoverable through review fees. |
| Return | AVOIDED COST |
Settle the four counts that gate every workload, staffing and funding figure the City produces.
| Produces | Field verified counts for outfalls, storm drain inlets, structural controls and active construction sites, reconciled to GIS and loaded into Civic as the authoritative number. |
| Duration | Three to four months. |
| Driven by | Consent Order 6(b) v and 6(d). Every per asset obligation in the permit. |
| Funding route | SRF planning. Operating budget. |
| Return | ENABLING |
Close the two reporting obligations never filed, then hold the cadence so the City is never again one missed period from an assessment.
| Produces | One catch up submittal covering every missed period, then standing bi-monthly and quarterly reports, and a managed correspondence file with the Department. |
| Duration | Catch up in 60 days. Standing service thereafter. |
| Driven by | Consent Order 6(e) and 7. |
| Funding route | Operating budget. |
| Return | AVOIDED COST |
Deliver the last outstanding item from the April 2026 assessment and unlock the closure letter.
| Produces | Draft ordinance, staff report, Commission presentation, transmittal to FDEP, and the enforcement procedure that follows adoption. |
| Duration | Three months. |
| Driven by | Consent Order 6(c) viii. Milestone passed 1 August 2026. |
| Funding route | Operating budget. |
| Return | AVOIDED COST |
Write and file the procedure the compliance matrix certifies exists and the record does not contain.
| Produces | Written procedure, review forms, inspection protocol for post construction controls, and the tracking record inside Civic. |
| Duration | Two months. |
| Driven by | Consent Order 6(b) i. Referenced as SOP 02-01, absent from the submitted set. |
| Funding route | Operating budget. |
| Return | AVOIDED COST |
Close the procedure five other procedures depend on, and make competency provable.
| Produces | Ten to fifteen role based modules, recorded completion, refresher schedule, and competency records held in Civic. |
| Duration | Four months, then annual. |
| Driven by | MS4 Permit Part III.A.7.c and 9.c. |
| Funding route | Operating budget. Partly grant eligible. |
| Return | ENABLING |
Fix the addressing and location layer so the City knows where its own infrastructure is. Today a work order, a permit, a meter and a pipe can each describe the same place differently.
| Produces | Reconciled master address file, address to asset linkage, geocoding standard, correction of conflicting and missing records, and a maintenance procedure so it stays correct. |
| Duration | Five to seven months. |
| Driven by | Every field obligation, every work order, every bill and every funding application. |
| Funding route | SRF planning. Operating budget. |
| Return | ENABLING |
What the City produces, loses, bills and pays to run.
This track answers what the City has never tested: whether revenue covers the cost of a compliant utility, how much water is paid for and never billed, and what condition the pipes are actually in.
Establish whether current revenue covers the cost of running a compliant utility, and if not, by how much and over what period that gap should close.
| Produces | Cost of service analysis, revenue requirement, rate alternatives, affordability and disadvantaged community testing, multi year rate schedule, Commission presentation. |
| Duration | Six to eight months. |
| Driven by | Every funding application tests revenue sufficiency. Debt service coverage. |
| Funding route | Operating budget. Often SRF eligible as planning cost. |
| Return | DIRECT RETURN |
Find out how much treated water the City buys or produces and never bills for, where it goes, and what it is worth to recover.
| Produces | AWWA M36 water audit with validity scoring, district metered area strategy, leak detection survey, apparent loss and meter accuracy analysis, costed reduction program with payback. |
| Duration | Six months for the audit. Reduction runs multi year. |
| Driven by | Revenue recovery. Funding scores. Water supply planning. |
| Funding route | SRF. Conservation grants. Pays for itself from recovery. |
| Return | DIRECT RETURN |
Replace aging and under registering meters with a system that reads itself, bills accurately, and tells a customer about a leak before the bill does.
| Produces | Meter population and accuracy assessment, technology and procurement strategy, business case with revenue uplift, phased deployment plan, customer portal and billing integration. |
| Duration | Assessment and business case in six months. Deployment multi year. |
| Driven by | Apparent loss recovery. Customer service. Conservation. |
| Funding route | SRF. Federal infrastructure funding. Revenue backed. |
| Return | DIRECT RETURN |
Put a flow meter on every pump station so the City knows what it moves, can prove what it discharges, and can size what it needs.
| Produces | Station by station metering assessment, meter selection and installation design, telemetry integration, calibration protocol, and the flow record feeding Civic Stations. |
| Duration | Assessment in four months. Installation phased. |
| Driven by | Inflow and infiltration quantification. Overflow reporting. Capacity. |
| Funding route | SRF. Consent Order related capital. |
| Return | ENABLING |
Make the instruments the City already owns, and those about to be installed, report into one place instead of five.
| Produces | Current state assessment, integration architecture, alarm rationalization, data historian strategy, and the connection into Civic so an alarm becomes a compliance record automatically. |
| Duration | Four to six months. |
| Driven by | Monitoring obligations. Operational response time. |
| Funding route | SRF. Capital. |
| Return | AVOIDED COST |
Establish the true age, material and condition of the distribution system. It is reasonable to assume much of it is between 75 and 100 years old and past its useful life, but assumption is not a fundable position.
| Produces | Pipe inventory by material, age and diameter, break history analysis, condition assessment and criticality scoring, remaining useful life estimate, and a prioritized renewal program with annual replacement rate and cost. |
| Duration | Eight to ten months. |
| Driven by | Break rate. Water loss. Water quality. Every capital funding application. |
| Funding route | SRF. Federal infrastructure funding. |
| Return | DIRECT RETURN |
The Nichols area is understood to contain asbestos cement mains. Establish where they are, what condition they are in, and how they will be handled, before a break makes that decision for the City.
| Produces | AC main mapping and extent, condition and degradation assessment, break and exposure history, worker and public safety protocol, regulatory handling and disposal procedure, and a prioritized replacement plan. |
| Duration | Five to six months. |
| Driven by | Worker safety and public health. Water quality. Liability exposure. |
| Funding route | SRF with likely priority. Federal lead and legacy pipe funding. |
| Return | AVOIDED COST |
Pumping is usually the largest controllable operating cost a utility has, and it is almost always cheaper to fix than it looks.
| Produces | Energy audit of every station, pump efficiency testing, variable frequency drive and control assessment, utility rate and demand charge review, and a costed efficiency program with measured payback. |
| Duration | Four to five months. |
| Driven by | Operating cost. Reliability. Carries its own business case. |
| Funding route | Utility rebates. SRF. Energy performance contracting. |
| Return | DIRECT RETURN |
The funding, the conditions, and the credit standing.
Money is available and the City qualifies. This track meets the conditions attached to it, brings Miami-Dade County and WASD in behind the City, and builds the credit position that makes bonds and WIFIA reachable.
Turn a list of needs into a funded program, and keep the City in front of every window that opens.
| Produces | Funding source matrix, eligibility screening per project, application calendar, prepared applications, and a standing pursuit service through award. |
| Duration | Strategy in three months. Standing service thereafter. |
| Driven by | Roughly $17.2M identified, of which about $8.43M potentially forgivable. |
| Funding route | Operating budget. Recovered many times on award. |
| Return | DIRECT RETURN |
Meet the condition attached to every dollar of federal and state revolving fund money the City intends to accept, before it becomes a finding.
| Produces | Title VI plan and policy, nondiscrimination assurances, language access and limited English proficiency plan, public participation procedure, complaint procedure and log, designated coordinator, staff training and annual report. |
| Duration | Four months, then annual maintenance. |
| Driven by | Title VI of the Civil Rights Act of 1964. A condition of federal and SRF money. |
| Funding route | Operating budget. Often loan eligible. |
| Return | ENABLING |
Convert eligibility into money, and keep the loan compliant so the money keeps arriving.
| Produces | Facilities planning documentation, environmental review, application preparation, priority list positioning, disadvantaged community demonstration, and disbursement and reporting administration through the loan term. |
| Duration | Cycle dependent. Administration runs the loan term. |
| Driven by | Lead lines, stormwater, wastewater and water capital. |
| Funding route | SRF administrative allowance. Loan eligible. |
| Return | DIRECT RETURN |
Meet the federal deadline with a defensible inventory, and build the replacement program the funding attaches to.
| Produces | Service line material inventory and validation, customer notification program, replacement prioritization, planning and design package, and the funding application that carries it. |
| Duration | Inventory and plan in eight months. Replacement runs to 2036. |
| Driven by | Lead and Copper Rule Improvements. Federal deadlines. |
| Funding route | SRF with substantial forgiveness. Dedicated federal lead funding. |
| Return | DIRECT RETURN |
The City cannot raise debt on acceptable terms while it sits under an open Consent Order with an unproven record and an untested rate. This engagement builds the position that changes that, and sequences the steps that make the City creditworthy.
| Produces | Credit position assessment, debt capacity analysis, coverage and reserve policy, rating agency narrative, disclosure readiness, and a staged roadmap from current position to a defensible bond issue. |
| Duration | Six months. Roadmap runs three to five years. |
| Driven by | Capital need exceeds grant and loan capacity. Bonds are the eventual instrument. |
| Funding route | Operating budget. Cost of issuance on execution. |
| Return | ENABLING |
Protect the rate case and the customers at the same time. Affordability evidence is also what qualifies the City for the most favorable funding terms available.
| Produces | Affordability analysis by household, disadvantaged community demonstration, assistance program design, arrears and shutoff policy review, and the documentation funding agencies ask for. |
| Duration | Four months. |
| Driven by | SRF disadvantaged community status. Rate case defensibility. |
| Funding route | Operating budget. Supports forgiveness eligibility. |
| Return | DIRECT RETURN |
The City does not have to carry this alone. Miami-Dade County and the Water and Sewer Department hold technical capacity, funding relationships and a direct interest in the performance of the systems Opa-locka connects to. This engagement formalises that support rather than relying on goodwill.
| Produces | Structured approach to the County and to WASD, a written request for technical assistance and letters of support, review of the existing wholesale and interlocal arrangements, identification of joint or sponsored funding applications, and a standing coordination channel at staff level. |
| Duration | Three to four months, then a standing relationship. |
| Driven by | Regional interdependence. County support materially strengthens every application the City makes, and a letter of support is often the difference between a scored and an unscored submission. |
| Funding route | Operating budget. County technical assistance is frequently provided at no cost. |
| Return | ENABLING |
Test and, if viable, pursue the federal Water Infrastructure Finance and Innovation Act loan. WIFIA carries longer terms and lower cost than most alternatives, and the small community threshold is within reach for a bundled Opa-locka program.
| Produces | Eligibility and threshold assessment, project bundling strategy to reach the small community minimum, financial capability and creditworthiness analysis, letter of interest, and the full application with the County and WASD engaged in support where that strengthens it. |
| Duration | Feasibility in three months. Letter of interest and application on the federal cycle. |
| Driven by | Capital need beyond grant and revolving fund capacity. Terms materially better than bonds. |
| Funding route | WIFIA itself. Blends with SRF on the same program. |
| Return | DIRECT RETURN |
The documents that make everything else fundable.
The documents reviewers look for before they look at anything else, the model that tests a decision before money is committed, and the plan for the day something goes wrong.
The one document that changes how every future funding request is received, because a reviewer asks whether a project sits inside a plan before asking anything else.
| Produces | Asset inventory and condition, level of service, hydraulic and capacity analysis, year by year capital program, operating program, funding and debt service plan, and the rate position that carries it. |
| Duration | Nine to twelve months. |
| Driven by | Every funding application. Obligations to 2030 and lead lines to 2036. |
| Funding route | SRF planning. Operating budget. |
| Return | ENABLING |
Separate what stormwater costs to build from what it costs to run, and show the revenue that carries both.
| Produces | Stormwater asset inventory, level of service, five year capital program, recurring operating cost of the compliance program, and a stormwater revenue position. |
| Duration | Six to eight months. |
| Driven by | Consent Order 6(d). MS4 Permit. Structural controls to 2030. |
| Funding route | SRF planning. Stormwater revenue. |
| Return | ENABLING |
Remove the single custodian risk and put the asset record in one place the field can update and the report can read.
| Produces | Data model, migration and cleanup, field update workflow, atlas maintenance procedure, role based access, and the live link into Civic so the counts never diverge again. |
| Duration | Six to nine months. |
| Driven by | MS4 Permit Part III.A.1 mapping. Every per asset obligation. |
| Funding route | SRF planning. Partly capital eligible. |
| Return | ENABLING |
Find out how much of what the City treats is groundwater and stormwater it was never meant to receive, and what it costs to keep treating it.
| Produces | Flow monitoring, smoke and dye testing, manhole and pipe condition assessment, closed circuit inspection program, and a prioritized rehabilitation plan. |
| Duration | Nine to twelve months. |
| Driven by | Overflow reduction. Treatment cost. Capacity for growth. |
| Funding route | SRF. Consent Order related capital. |
| Return | DIRECT RETURN |
The City serves customers beyond its own boundary, including portions of Miami Gardens. Establish exactly what is served, under what agreement, at what cost and at what recovery.
| Produces | Service area boundary verification, customer and account reconciliation by jurisdiction, interlocal and wholesale agreement review, cost of service by service area, and a position on whether the City is recovering what it spends. |
| Duration | Five to six months. |
| Driven by | Revenue leakage. Rate defensibility. Obligation clarity between jurisdictions. |
| Funding route | Operating budget. Recoverable from corrected recovery. |
| Return | DIRECT RETURN |
Build a calibrated model of the water and sewer systems so capacity, fire flow, water age and capital decisions are tested before money is committed rather than after.
| Produces | Calibrated hydraulic models for water and sewer, fire flow and water quality analysis, capacity assessment for growth, scenario testing, and a live link to telemetry so the model stays current instead of aging on a shelf. |
| Duration | Eight to ten months. |
| Driven by | Capital prioritization. Capacity certification. Every design decision. |
| Funding route | SRF planning. Capital. |
| Return | ENABLING |
Meet the federal requirement, and be ready for the storm, the outage and the cyber incident that will each arrive without notice.
| Produces | AWIA risk and resilience assessment, emergency response plan, cybersecurity assessment for control systems, hurricane and flood readiness, continuity of operations, mutual aid, and a tabletop exercise program. |
| Duration | Six months, then on the statutory recertification cycle. |
| Driven by | America's Water Infrastructure Act. Insurance and continuity. Cyber exposure. |
| Funding route | Federal resilience grants. SRF. Operating budget. |
| Return | AVOIDED COST |
Most of this program is loan or grant eligible. The cheapest items are not.
The pattern is worth naming. The engagements hardest to fund cost the least, because they produce documents rather than assets. The ordinance, the reporting cadence, the missing procedure and the Title VI program together are a small fraction of the program, and they are what stands between the City and a closure letter.
The City does not have to do this alone. Miami-Dade County and the Water and Sewer Department hold technical capacity and funding relationships the City can draw on, and they have a direct interest in the performance of the systems Opa-locka connects to. A written request for technical assistance and letters of support costs nothing and materially strengthens every application. Engagement C-07 formalises that.
WIFIA is the instrument nobody has tested. The federal Water Infrastructure Finance and Innovation Act offers longer terms and lower cost than most alternatives, and the small community threshold is reachable if the City bundles its program rather than applying project by project. Engagement C-08 tests it properly instead of assuming the City is too small.
Title VI is a condition, not a project. Accepting federal or revolving fund money brings a nondiscrimination obligation with it. It is inexpensive to satisfy in advance and expensive to remediate after a finding, which is why it sits early in the sequence rather than alongside the first award.
Twelve quarters, in the order the dependencies allow.
| Ref | Engagement | Why it is first |
|---|---|---|
| A-06 | Erosion control ordinance | The milestone has passed. It is the last item standing between the City and a formal closure letter. |
| A-05 | Reporting catch up and cadence | Two obligations have never been filed and neither has been cited. Filing before they are cited changes the conversation. |
| A-07 | Post construction procedure | The compliance matrix certifies a procedure the record does not contain. That gap is visible to anyone who checks. |
| A-01 | Civic, phase 1 | Every other engagement produces a record. Without one place to put it, each creates another silo. |
| A-04 | Asset counts | Four numbers gate the workload model, the staffing case and every funding application. |
| B-02 | Water audit, start | The longest lead item with a direct financial return. Starting now means an answer inside the same budget year. |
Only Civic is a build, and phase one of Civic is configuration rather than construction.
Delivery model, ownership, and the handover that matters.
| Continuing services | One agreement with task orders against it, so an engagement starts when the need is agreed rather than when procurement finishes. |
| One accountable lead | One person accountable for the whole program, so the City is not integrating its own consultants. |
| Embedded, not adjacent | Work performed with department staff rather than delivered to them, because the capability has to remain when the engagement ends. |
| Documented handover | Every engagement ends with the City holding the record, the method and the ability to repeat it. |
Every output belongs to the City on delivery. The Civic configuration, the data model, the procedures, the counts, the standards and the plans. Nothing is licensed back and nothing is held against a renewal.
That matters more than it sounds. The record is fragile today because pieces of it sit with people and firms rather than with the department. A program that repeated that pattern would treat the symptom and leave the cause in place.
If every consultant left tomorrow, could the department still produce its next regulatory report on time, from its own record, without calling anybody?
Today the answer is no. That is the single measure this program should be judged against, and it is reachable inside twelve months.
All 32 engagements on one list, for reference.
| Ref | Engagement | Track | Duration | Return |
|---|---|---|---|---|
| A-01 | Civic, the regulatory system of record | A | Phase 1 in 90 days. Full program over 12 months. | AVOIDED |
| A-02 | Civic Stations, pump station compliance module | A | Six months, following Civic Phase 1. | AVOIDED |
| A-03 | Engineering design standards for conveyed assets | A | Six to nine months. | AVOIDED |
| A-04 | Asset count verification and reconciliation | A | Three to four months. | ENABLING |
| A-05 | Consolidated progress reporting and regulatory correspondence | A | Catch up in 60 days. Standing service thereafter. | AVOIDED |
| A-06 | Erosion and sediment control ordinance adoption | A | Three months. | AVOIDED |
| A-07 | Post construction review procedure | A | Two months. | AVOIDED |
| A-08 | Training, competency and records program | A | Four months, then annual. | ENABLING |
| A-09 | Master address and asset location database | A | Five to seven months. | ENABLING |
| Ref | Engagement | Track | Duration | Return |
|---|---|---|---|---|
| B-01 | Comprehensive water and sewer rate study | B | Six to eight months. | DIRECT |
| B-02 | Non revenue water assessment and reduction program | B | Six months for the audit. Reduction runs multi year. | DIRECT |
| B-03 | Advanced metering infrastructure program | B | Assessment and business case in six months. Deployment multi year. | DIRECT |
| B-04 | Pump station flow metering program | B | Assessment in four months. Installation phased. | ENABLING |
| B-05 | Telemetry, SCADA and alarm integration | B | Four to six months. | AVOIDED |
| B-06 | Water main condition assessment and renewal program | B | Eight to ten months. | DIRECT |
| B-07 | Asbestos cement main assessment and management plan | B | Five to six months. | AVOIDED |
| B-08 | Pump station energy and efficiency program | B | Four to five months. | DIRECT |
| C-01 | Capital funding strategy and pursuit | C | Strategy in three months. Standing service thereafter. | DIRECT |
| Ref | Engagement | Track | Duration | Return |
|---|---|---|---|---|
| C-02 | Title VI civil rights compliance program | C | Four months, then annual maintenance. | ENABLING |
| C-03 | State Revolving Fund application and loan administration | C | Cycle dependent. Administration runs the loan term. | DIRECT |
| C-04 | Lead service line inventory and replacement planning | C | Inventory and plan in eight months. Replacement runs to 2036. | DIRECT |
| C-05 | Bond readiness and credit positioning | C | Six months. Roadmap runs three to five years. | ENABLING |
| C-06 | Customer affordability and assistance program | C | Four months. | DIRECT |
| C-07 | Miami-Dade County and WASD partnership and technical assistance | C | Three to four months, then a standing relationship. | ENABLING |
| C-08 | WIFIA loan feasibility and application | C | Feasibility in three months. Letter of interest and application on the federal cycle. | DIRECT |
| D-01 | Five year water and sewer master plan | D | Nine to twelve months. | ENABLING |
| D-02 | Stormwater capital and operating plan | D | Six to eight months. | ENABLING |
| Ref | Engagement | Track | Duration | Return |
|---|---|---|---|---|
| D-03 | GIS and asset mapping program | D | Six to nine months. | ENABLING |
| D-04 | Sewer system evaluation and inflow and infiltration study | D | Nine to twelve months. | DIRECT |
| D-05 | Service area, wholesale and interlocal analysis | D | Five to six months. | DIRECT |
| D-06 | Hydraulic model and digital twin | D | Eight to ten months. | ENABLING |
| D-07 | Risk, resilience and emergency response program | D | Six months, then on the statutory recertification cycle. | AVOIDED |
APAS Consulting works with water, wastewater and stormwater utilities on regulatory compliance, asset and data programs, capital planning and funding strategy. We build the record a utility needs to prove what it does, and the plan it needs to fund what comes next.
| Document | Program of Services, Civic and the Work That Surrounds It |
| Revision | Rev B, issued 16 August 2026 |
| Status | For discussion. Scope and duration only, no fees |
| Review method | Open this file in a browser and use the review toolbar to edit text, attach notes to any engagement, and export those notes |
This document sets out engagements the department may wish to consider. It is not a proposal, a fee quotation or an offer, and it does not commit either party. Durations are indicative and depend on the availability of City data and staff. Funding routes are shown as the most likely source based on current program rules and are subject to agency confirmation. Nothing here constitutes legal advice or a representation to any funding agency.